Shock testing for a smoother ride
Kaz worked alongside Trust Performance to consult on the design and development of the all-new damper as part of Trust’s innovative linkage fork. Along with the damper hardware design we also supported development of system-level damping targets.
Throughout the entire design cycle, Kaz did all shock testing from prototypes to production versions validating design targets and finding areas for improvement along the way.
For the production facility, Kaz built and supplied an end-of-the-line test machine and test procedure that automatically swept all shock adjusters and verified each shocks performance before leaving the factory.